MAX Power Targets Next-Generation AI Infrastructure Powered by Natural Hydrogen Following Lawson Discovery
MOU with TerraVolt Energy advances integrated Natural Hydrogen-powered energy and cooling infrastructure model designed to address the accelerating power and water demands of global AI data center expansion
REGINA, Saskatchewan, June 01, 2026 (GLOBE NEWSWIRE) — MAX Power Mining Corp. (CSE: MAXX; OTC: MAXXF; FSE: 89N) (“MAX Power” or the “Company”) is pleased to announce that it has entered into a Memorandum of Understanding (“MOU”) with TerraVolt Energy, LLC (“TerraVolt”), an advanced AI infrastructure and distributed energy systems company, together with EcoTech Building Solutions (“EcoTech”) and Carbon Neutral Growth Fund to evaluate the integration of Natural Hydrogen, modular power systems, sustainable building infrastructure, and associated produced brine waters from potential future Lawson development into next-generation AI and high-performance computing infrastructure.
Highlights
- With traditional data center development raising concerns around grid demand, water consumption, and community impact, this MOU contemplates a cleaner, more sustainable model that combines renewable power, water recycling and reuse;
- This collaboration represents an important strategic step in MAX Power’s broader commercialization strategy following drilling confirmation of Canada’s first subsurface Natural Hydrogen system, with a potentially significant Helium component, at the Lawson Complex in the heart of Saskatchewan’s 475-km Genesis Trend;
- TerraVolt is managing and developing a growing power portfolio exceeding 12 GW, enough to power approximately 10 million average homes. The company integrates AI-driven optimization to reduce energy consumption, minimize unplanned downtime, and improve operational efficiency.
The MOU between MAX Power, TerraVolt, EcoTech Building Solutions and Carbon Neutral Growth Fund follows significant technical advancement at Lawson including robust data from high-resolution 3D seismic imaging. This materially enhanced the Company’s understanding of the interpreted structural scale, continuity, apex targets, and future commercial development potential of the system. Following completion May 29, 2026, of a $25 million private placement with legendary mining financier Eric Sprott, which increased his ownership position in MAX Power to 19%, the Company is finalizing plans for an expanded near-term follow-up drill program designed to validate commerciality at the Lawson Complex (refer to May 22, 2026 news release).
MAX Power believes the Lawson Discovery represents more than a subsurface energy discovery – it may provide the foundation for evaluating a new category of integrated energy, cooling, and distributed infrastructure systems tied directly to accelerating global AI demand.
Mr. Ran Narayanasamy, MAX Power, commented:
Lawson confirmed far more than just the presence of Natural Hydrogen.
”It confirmed the potential foundation for a new category of integrated energy and infrastructure development centered around clean, scalable baseload power generation. As artificial intelligence and digital infrastructure growth accelerate globally, pressure on power systems and cooling infrastructure continues to intensify. Our focus is on understanding how all facets of the Lawson system may contribute to future commercialization pathways through technical validation, infrastructure integration, and practical deployment strategy. This MOU is an important step in that direction.”
Mr. Steven Lund, CTO of TerraVolt Energy, commented:
Artificial intelligence infrastructure is rapidly evolving into one of the largest new consumers of electricity and industrial cooling capacity globally.
”Future AI deployment will increasingly require scalable energy systems capable of supporting resilient, distributed compute infrastructure outside traditional grid constraints. We believe MAX Power’s Lawson Natural Hydrogen system together with associated produced brine waters presents a compelling opportunity to evaluate an integrated model combining clean baseload power generation, advanced cooling infrastructure, and modular AI deployment directly at the source of energy production.”
Innovative, Efficient Use of Brine Waters
Beyond energy generation, the collaboration is evaluating how associated brine waters at the Lawson Complex and other potential Natural Hydrogen deposits being explored by MAX Power in Saskatchewan may support integrated cooling, water treatment, and infrastructure applications for future AI data center systems. The infrastructure framework under evaluation incorporates closed-loop water management concepts designed to recycle and repurpose a substantial portion of operational water requirements while supporting potential long-term industrial and community infrastructure applications.
As artificial intelligence adoption accelerates globally, rapidly growing power demand and industrial-scale cooling requirements are emerging as two of the largest constraints on future AI infrastructure expansion. Existing electrical grids are facing increasing strain from accelerating compute demand, transmission bottlenecks, rising infrastructure costs, and the significant water requirements associated with large-scale data center operations.
Mr. Keith Lewis, Carbon Neutral Growth Fund, commented:
MAX Power’s Natural Hydrogen and the brine that’s associated with these systems in Saskatchewan creates an opportunity to rethink how AI data centers are powered, cooled, and integrated into local communities.
”Traditional data center development is raising legitimate questions around grid demand, water consumption, and community impact. Carbon Neutral Growth Fund is focused on helping shape a cleaner, more responsible model that combines renewable power, water recycling and reuse, and meaningful community participation from the beginning.”
AI Infrastructure Development in Saskatchewan
The timing of the collaboration aligns with rapidly accelerating AI infrastructure development activity across Saskatchewan and Canada. Earlier this year, Bell Canada received approval for Canada’s largest proposed data center development in the Regina-Moose Jaw Industrial Corridor, adjoining the Genesis Trend (source: https://www.cbc.ca/news/canada/saskatchewan/ai-data-rm-of-sherwood-9.7130417), reflecting growing policy and infrastructure support for sovereign AI compute expansion. As hyperscale AI infrastructure continues scaling globally, long-term access to scalable clean power generation together with sustainable water management and cooling systems is becoming increasingly critical to future data center deployment strategy.
The model being evaluated by MAX Power and TerraVolt is designed around a fundamentally different infrastructure approach whereby modular compute and power systems are deployed directly at the energy source itself. The framework is intended to evaluate whether locally sourced Natural Hydrogen, together with associated produced brine waters, can support integrated distributed power generation and cooling infrastructure for next-generation AI and advanced computing systems. If validated at the Lawson Complex, the model could represent an important evolution in how future AI infrastructure is powered, cooled, and deployed.
Technical Scope of Collaboration
Under the MOU, MAX Power and TerraVolt intend to evaluate:
- Integration of Natural Hydrogen production with on-site power generation systems
- Utilization of associated Lawson brine waters for cooling, infrastructure, and potential supplemental power-generation applications in tandem with Natural Hydrogen systems
- Modular infrastructure systems supporting AI data centers and high-performance computing environments
- Hydrogen handling, storage, and power-conversion system
- Phased deployment models aligned with demonstrated deliverability and future development milestones
- Pilot and demonstration opportunities for integrated Natural Hydrogen-powered infrastructure systems
The parties will also evaluate phased infrastructure concepts capable of scaling alongside future potential Natural Hydrogen development activities, subject to technical validation, engineering studies, regulatory approvals, financing, and future definitive agreements.
Mr. Chad Dorsett, President of EcoTech Building Solutions, commented:
AI data centers require buildings that perform at the same level as the technology they house.
”EcoTech is focused on delivering resilient, non-combustible, energy-efficient building solutions that support faster construction, stronger thermal performance, and long-term operational reliability. Working alongside MAX Power creates an opportunity to align advanced clean energy infrastructure with the next generation of high-performance AI data-center buildings.”
Modular Natural Hydrogen Power Systems
As part of the collaboration, the parties will evaluate modular Natural Hydrogen-powered infrastructure systems designed to integrate on-site Natural Hydrogen production, continuous baseload power generation, advanced cooling applications, and distributed AI compute infrastructure.
The infrastructure concepts under evaluation are intended to support scalable, dispatchable, and low-emission power solutions suitable for a broad range of mission-critical and energy-intensive applications, including:
- AI data centers and high-performance computing infrastructure
- Industrial and manufacturing facilities
- Strategic infrastructure environments
- Remote and off-grid operations
- Dual-use military and mission-critical deployment systems
The modular architecture is designed to support phased deployment and scalable expansion tied directly to future drilling success, reservoir evaluation, and demonstrated deliverability from potential future Lawson development activities.
Infrastructure systems being evaluated include modular generating units capable of phased deployment through multiple independent infrastructure modules supporting scalable power expansion over time while maintaining operational resiliency and continuous infrastructure performance.
The collaboration will also evaluate the integration of associated produced brine waters from Lawson into advanced cooling, operational, and water management applications designed to support large-scale AI infrastructure requirements.
In addition, the parties are evaluating advanced infrastructure concepts incorporating low voltage electrical systems, fluid dynamics, water purification technologies, and AI-assisted operational optimization designed to support continuous baseload infrastructure deployment and distributed energy applications.
Alignment With Canada’s Sovereign AI Compute Strategy
In parallel with the MOU, MAX Power and TerraVolt have submitted an application under Innovation, Science and Economic Development Canada’s (“ISED”) Sovereign AI Compute Infrastructure Program as part of the Canadian Sovereign AI Compute Strategy.
The submission reflects a shared objective of supporting secure, domestically powered, and infrastructure-resilient AI compute systems in Canada utilizing Canadian energy resources, infrastructure, and innovation.
As MAX Power moves toward confirming what it posits to be the world’s first large-scale Natural Hydrogen system at the Lawson Complex, the collaboration is intended to evaluate whether Saskatchewan and Canada can emerge at the forefront of a new category of integrated energy and AI infrastructure development.
Strategic Development Team
The collaboration between MAX Power, TerraVolt, EcoTech Building Solutions, and Carbon Neutral Growth Fund brings together expertise spanning Natural Hydrogen exploration, AI infrastructure, modular energy systems, sustainable construction, and clean energy development.
Steven Lund, CTO of TerraVolt Energy, LLC, is a technology and infrastructure executive with experience spanning AI-driven systems, advanced computing infrastructure, and high-performance data center deployment. Mr. Lund has held executive leadership roles with Apple, Cisco Systems, and Hewlett Packard and has founded multiple AI and machine-learning focused technology companies supporting artificial intelligence, IoT, cybersecurity, and energy management systems.
Chad Dorsett, President of EcoTech Building Solutions, brings extensive experience in prefabricated construction, advanced building systems, and high-performance infrastructure deployment. EcoTech specializes in energy-efficient, non-combustible building systems supporting industrial, commercial, and AI infrastructure projects.
Keith M. Lewis of Carbon Neutral Growth Fund brings expertise in clean energy strategy, infrastructure partnerships, ESG alignment, and capital formation focused on advancing carbon neutral infrastructure and sustainable industrial development initiatives.
READ the latest news shaping the hydrogen market at Hydrogen Central
MAX Power Targets Next-Generation AI Infrastructure Powered by Natural Hydrogen Following Lawson Discovery, source




