Syntholene Produces First 500 Kilograms of Hydrogen at Husavik Demonstration Facility
Milestone Demonstrates Successful Operation of World’s First Geothermally-Integrated SOEC Hydrogen Production System
Chicago, Illinois–(Newsfile Corp. – July 7, 2026) – Syntholene Energy Corp. (TSXV: ESAF) (OTCQB: SYNTF) (FSE: 3DD0) (“Syntholene” or the “Company”) is pleased to announce that it has successfully produced its first 500 kilograms of ‘green’ electrolytic hydrogen at its geothermally-integrated Solid Oxide Electrolyzer Cell (“SOEC”) demonstration facility in Húsavík, Iceland (the “Demonstration Facility”).
Overhead View of Syntholene Demonstration Facility Thermal Coupling Housing and SOEC Infrastructure in Húsavík, Iceland
Dan Sutton, Chief Executive Officer of Syntholene, Stated:
We are actively producing Hydrogen. Today.
“Production from Syntholene’s thermally integrated SOEC system demonstrates that the facility is operating as designed. With commissioning now complete, our focus shifts toward extended effects testing and independent validation of system performance over the coming months.”
Initial analytical testing at the Demonstration Facility indicates hydrogen purity above 99.9%, consistent with anticipated system performance. Hydrogen is the dominant cost driver of synthetic aviation fuel production (IEA), and producing it at low cost is central to achieving cost competitive synthetic fuels.
Based on preliminary operational data collected at the Demonstration Facility to date, the Company believes stack and overall system electrical performance are tracking in line with the equipment manufacturer’s factory specifications, including stack electrical consumption of approximately 33.5 kWh/kg H₂ and overall system electrical consumption of approximately 37.8-40.0 kWh/kg H₂. These preliminary observations and estimates remain subject to continued operational testing and independent third-party validation. Green electrolytic hydrogen refers to hydrogen produced through the electrolysis of water using renewable or other non-fossil electricity, with minimal direct greenhouse gas emissions associated with the production process.
This production milestone marks the successful commencement of integrated operations following completion of construction and commissioning of the Company’s Demonstration Facility. Initial operating results indicate that major process systems are performing in line with design expectations, including successful thermal integration between the geothermal heat source and the SOEC hydrogen production system.
The Company has commenced continuous operational testing of the Demonstration Facility, including evaluation of stack performance, system efficiency, thermal integration, reliability, and operating economics under sustained operating conditions. Data generated during the testing campaign is expected to support future engineering optimization, commercial project development, financing initiatives, and strategic partnerships. Syntholene continues to target publication of independently validated performance data from a full effects test campaign in Q42026.
The Demonstration Facility has been designed to evaluate the integration of geothermal heat with high-temperature electrolysis as a pathway toward low cost hydrogen production for synthetic fuel manufacturing.
READ the latest news shaping the hydrogen market at Hydrogen Central
Syntholene Produces First 500 Kilograms of Hydrogen at Husavik Demonstration Facility, source




